2020

2020: Nexus North Water Works Project in (Tubas-JWSSC) Service Area

The Tubas NEXUS project is a project that is intended to link the supply of water and the generation of electricity together. For the 1st phase of this project we are executed a new SCADA system for the supply of water in Tubas, Aqqaba and Tammoun areas.

 

Features include:

 

 1- Monitoring of all pumping stations, reservoirs and DMA including flow meters, levels, pressures and pump status. 
2- Automatic operation of all sites so that the network can be left unattended.
3- SMS alarming in case of any warning or error in the system.
4- Automatic flow limiting for villages to allow fair distribution of water resources.
5- Manual operation of the network from the SCADA control room.
6- Localization of leaks and detection suspicious flows.
7- Historical data of the network.
8- Automatic report generation.
9- Being able to identify problems and their cause via SCADA.
10- Remote access to the SCADA for urgent actions.
11- Remote reset of pumping stations instead of sending operators.
12- Operational automatic network even when the main SCADA server is down, due to inter station communication.

2020: Water supply system for Sabastiya cluster

The project consists of:

1) Burqa booster station & Burqa reservoir

2) Qabalan Booster station & Qabalan reservoir

 

Our role in this project is to provide the control cabinet and 3G communication modules between each booster and reservoir to control the pumping of water without relying on the float valve. SMS alarming and status is also included for each village to allow them to manage their water resources in optimal way.