2013

PCS was in charge along with LIGHT EMCO Ltd. of design of a new state-of-the-art factory for ARZ Ice-Cream. The design includes the following:

  • SCADA system and PLCs (SIEMENS)
  • Electrical distribution (around 5000 Amps)
  • Multi-site Management system that brings together:
    • Access Control
    • Intrusion Alarm
    • Fire Alarm
    • CCTV
    • Elevator Control
    • Parking gates
    • BMS